Technology

Semantic Link prototype and integration targets

Inspect recorded software output, the measured data rate, and the engineering targets for integration on an unmanned platform.

Recorded software prototype output

The source footage is shown alongside the ground reconstruction. In these runs, the ground station received scene updates over the semantic stream.

Actual prototype output
Recorded forest-trail test with onboard camera footage on the left and ground reconstruction of the trail and trees on the right

Onboard camera

Ground reconstruction

Forest trail. The reconstruction shows the path, terrain, and surrounding trees from the received scene updates.
1.74 kbps
Measured semantic stream
136 bytes
Per scene update
1.5 updates/s
Scene update frequency
TRL 4
Software prototype

The reported rate applies to semantic updates. Prioritized camera images require additional link capacity.

Processing and reconstructing the scene

Onboard perception extracts scene geometry and object information from the camera stream. A semantic encoder sends updates through the available data channel.

The ground decoder applies the received updates to its scene state. The renderer follows that state deterministically, so the display reflects the geometry and objects described by the updates. Coverage and freshness depend on perception and link capacity.

View the architecture diagram
Radio interface
Designed to use the platform’s existing data link and available transport.
Onboard compute
Perception and encoding run at the edge, using the camera feed and available platform data.
Operator display
The ground station decodes scene updates and reconstructs the view from the received data.

Embedded integration targets

These engineering goals guide the next stage of embedded integration. System latency will depend on perception, encoding, link scheduling, and ground processing.

Request the Integration Brief
Planned edge configuration
Candidate computeJetson Orin Nano or equivalent
Power target7–15 W
Weight targetUnder 250 g
Latency targetUnder 300 ms

Next steps in validation

Embedded integration

Port the software to compatible compute and measure runtime, power, and latency on a representative platform.

Bench evaluation

Measure how reconstruction quality and update timing change at defined link capacities.

Platform validation

Evaluate the integrated system with manufacturers on representative air and ground platforms.

Recorded prototype output